Before You Begin
The installation kit contains a registration card, the AT-3000 device, eight 8″ cable ties, one Star Washer, one Self-tapping Screw, five Yellow/Blue Heat Shrink Butt Connectors, one heat shrink ring terminal, one grommet, and two bolts with Well Nuts.
Additional tools and supplies you will need include are; ink pen, fine-tip marker, digital multimeter, a crimping tool, a razor knife, wire strippers, electrical tape, cordless drill, 1/4″ (7mm), and 3/8” (9 mm) drill bits, Phillips bit and 7/64 in. (3 mm) hex key.
For install verification and device registration, visit https://verifygps.gpsinsight.com and bookmark the page.
Installation Overview
The following steps provide an overview of the installation process:
- Installation Preparation
- Device Mounting
- Harness Installation
- Conventional Hardwire
- Small Battery
- Motion
- Verification and Registration
- Installation Steps
Installation Steps
1. Installation Preparation.
- Record the 10-digit device number (ESN) onto your registration card.
- Identify a mounting location, ideally level and on top of the asset.
- Inspect underneath the potential mounting location to confirm nothing will be damaged during mounting.
- Record the 10-digit device number (ESN) onto your registration card.
2. Device Mounting.
- Place the device on the asset, mark mounting holes, drill using 1/4″ (7mm) bit, insert Well Nuts and screw the device to the asset.
- If power cable needs to breach asset housing, utilize the provided grommet and butt connectors.
A cable breach point should be located where it’s least susceptible to weather; the top of the asset is not recommended.
-Accessory installation-
- Place the device on the asset, mark mounting holes, drill using 1/4″ (7mm) bit, insert Well Nuts and screw the device to the asset.
3. Harness Installation.
Identify an asset wire which supplies between 12 VDC (+) and 24 VDC (+) when the key is in the Ignition On position and 0 VDC (+) when the key is in the Off and Accessory positions; this will be the device’s White wire Switch power source. Identify an asset wire that supplies between 12 VDC (+) and 24 VDC (+) with the vehicle On, Off, and keys removed; this will be the device’s Red wire Constant power source.
- Cut the asset wire identified, remove ½” of insulation from each end, and fray wire strands on one side.
- Remove ½” of insulation from the device White wire, fray, and then twist together with frayed vehicle circuit wire.
- Insert the single-vehicle wire into the Blue side of the connector and then the two wires into the Yellow side and crimp each.
- Heat the connector to release adhesive creating a weatherproof seal before completed with a cable tie stress loop.
Identify an asset wire which supplies between 12-24 VDC (+) when the key is in the Ignition On position, but 0 VDC (+) when the key is in the Off or Accessory positions; this wire will be the power source for both device Red and White wires.
- Cut the asset wire identified, remove ½” of insulation from each end, and fray wire strands on one side.
- Remove ½” of insulation from the device Red and White wires, fray, and then twist together with frayed vehicle circuit wire.
- Insert the single-vehicle wire into the Blue side of the connector and then three wires into the Yellow side and crimp each.
- Heat the connector to release adhesive creating a weatherproof seal before completed with a cable tie stress loop.
Identify an asset wire that supplies between 12 VDC (+) and 24 VDC (+) with the vehicle On, Off, and keys removed; this will be the device’s Red wire Constant power source.
- Cut the asset wire identified, remove ½” of insulation from each end, and fray wire strands on one side.
- Remove ½” of insulation from the device Red wire, fray, and then twist together with frayed vehicle circuit wire.
- Insert the single-vehicle wire into the Blue side of the connector and then the two wires into the Yellow side and crimp each.
- Heat the connector to release adhesive creating a weatherproof seal before completed with a cable tie stress loop.
4. Ground Connection.
Remove 1/2“ (1 cm) of insulation from the Black wire, crimp the ring terminal to the wire, heat connector and then screw ring terminal to the chassis.
5. Verification and Registration.
- Start the engine and run for 5 minutes; to pass verification for the ‘Small Battery’ installation type, the internal battery must have a charge.
- Confirm cellular and GPS connection: upon the device receiving power, device lights will begin to blink slowly and then faster as it searches for a signal. A solid amber light indicates a cellular network connection and a solid green light indicates a GPS connection.
- Open the web app: https://verifygps.gpsinsight.com/ on your computer or smartphone.
– Enter your Install Key.
– Select ‘Device Type’ according to the wiring option installed and follow the instructions.
- After verification and registration, using provided cable ties, place a cable tie over each fuse holder, secure any loose sections of cable, reassemble removed panels and give the Registration Card to your GPS administrator.